PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Compacting around Stair -4,5-Elev. 7 Facing North-East (800x600).jpg Excavation for the underground roughing at Sprinkler room (152A) Facing South-East (800x600).jpg Finished installing metal decking at partial Derrick -3 (2nd Floor) Facing West (800x600).jpg Installing rebar columns at Elev. 5,6 (3rd Floor) Facing South-East (800x600).jpg Building rebar mats for Elev. 5,6 (3rd Floor) Facing  North (800x600).jpg Compacted and backfilled inside Stair -5 pit Facing West (800x600).jpg Finished installing temporary power to the electrical panel Facing South (800x600).jpg
Previous pageNext page Finished installing metal decking at partial Derrick -3 (2nd Floor) Facing West (800x600)
Finished installing metal decking at partial Derrick -3 (2nd Floor) Facing West (800x600)